Gallery
The Official 5-Day Design Sprint
Share
Explore
Thursday: Prototype

icon picker
2. Divide and conquer

Once you've selected your tools, it'll be time to assign some jobs.
Prototyping works best when you assign specific roles, similar to the you assigned at the beginning of the sprint.

A. Set prototype roles

The
@Facilitator
should help the sprint team divvy up these jobs:
Prototype Roles
Assign Roles
Person
Assign Prototype Role
1
Lola Tseudonym
Stitcher
2
Buck Dubois
Interviewer
3
Polly Rose
Maker
4
Felix Marlin
Asset Collector
5
Adam Davis
Writer
6
MM
Maria Marquis
Maker
7
Mary Jones
There are no rows in this table


B. Divide up the storyboard

After assigning roles, you should also divide up the storyboard:
Sketch
User action
Image(s)
Owner
The Henry Ford
6
User reads FB ad and clicks through
09.16.21 - John Zeratsky_ Design Sprint - Frame 1.jpg
Polly Rose
User watches video and clicks on link to sign up
09.16.21 - John Zeratsky_ Design Sprint - Frame 2.jpg
Maria Marquis
User inputs email and clicks “sign up”
09.16.21 - John Zeratsky_ Design Sprint - Frame 3.jpg
Maria Marquis
User receives confirmation email and clicks “verify”
09.16.21 - John Zeratsky_ Design Sprint - Frame 4.jpg
User is taken to home page
09.16.21 - John Zeratsky_ Design Sprint - Frame 5.jpg
User browses coffee beans and clicks into item they like
09.16.21 - John Zeratsky_ Design Sprint - Frame 6.jpg



Share
 
Want to print your doc?
This is not the way.
Try clicking the ⋯ next to your doc name or using a keyboard shortcut (
CtrlP
) instead.